Skip to content

Computer Networking Cabling PORTFOLIO

万博体育下载苹果

Edgerton School District, Edgerton, WI

SPECIFICATIONS

LOCATION

Edgerton, WI

CLIENT

J.P. Cullen

CONTRACT AMOUNT

$417,000

FEATURED

600 Cables, Over 120,000 feet of Cat6 cable in all

Photo Credit: Bray Architects

This project included renovations to the science labs, commons, and office spaces along with building-wide infrastructure upgrades. Globalcom worked extensively on many different low voltage systems as part of the remodel of the high school, including the installation of a new paging system which included the install 275 speakers and cabling throughout the High School. We furnished and installed 250 Cat6 network cables used for voice, data, and cameras. The network cabling required added fiber work to support the added locations in the building. We extended single-mode fiber backbone to 2 locations from the existing MDF. We also installed cabling and terminated the devices at 24 doors as part of the remodel process.

友情链: 万博体育注册 _ 万博体育手机网页版在线登录 v4.4.12 安卓版 | 万博体育app官方入口 万博体育的代理商 v1.2.4 IOS版 | 万博体育平台下载|万博体育安卓版下载 v3.4.7 安卓版 | 万博体育地址 万博体育官方游戏地址,安卓版下载 v5.2.10 | 新万博体育首页|万博体育网址登录 v3.4.7 安卓版 | 万博最新体育app~万博体育欢迎你 安卓版下载 v5.5.14 | 万博体育官方网站登陆 - 万博体育投资 苹果下载 v2.2.1 |